May 04 2017

Contract to supply of 2 nos. of high-pressure condensate pumps to gas field “Dvalin” in Norway secured!

Strobl Pumpen has got the order to supply of 2 St. high-pressure condensate pumps to gas field “Dvalin” in Norway. Together with our long-time Norwegian partner Delta-P Pumpe og Compressor of Systemer AS in Sandvika – Norway could we secure this job successfully for us. We will supply 2 nos. of high-pressure condensate pumps in double casing design pumps complete with base frame, electric motor and supply system for shaft sealing system to gas processing on the oil- and gas platform “Heidrun” in the Northern Sea. The platform is operated by Norwegian State owned energy company Statoil. The subsidized gas will be transported in pipelines gas from the gas field “Dvalin” and treated at the platform. We supply high pressure-multistage centrifugal pumps in casing design pressure up to 120 bar and an existing system pressure up to 90 bar. The pumps will be delivered in autumn 2017.

We are very proud to be able to provide an extremely important part of the gas treatment process to this project.