{"id":498,"date":"2016-09-29T22:56:29","date_gmt":"2016-09-29T20:56:29","guid":{"rendered":"http:\/\/www.strobl-pumpen.de\/?p=498"},"modified":"2016-09-29T22:56:29","modified_gmt":"2016-09-29T20:56:29","slug":"pumpen-fuer-alle-faelle-maschinen-der-firma-strobl-sind-weltweit-im-einsatz","status":"publish","type":"post","link":"https:\/\/www.strobl-pumpen.de\/en\/pumpen-fuer-alle-faelle-maschinen-der-firma-strobl-sind-weltweit-im-einsatz\/","title":{"rendered":"Pumps for all applications &#8211; Machines from Strobl are in use worldwide"},"content":{"rendered":"<p><span lang=\"en\"><strong>Hilpoltstein (RHV)<\/strong> &#8211; More than a century was oil, the lubricant of the economy, without which no industry seemed to be possible. But this oil must\u00a0be first extracted from the earth&#8217;s interior, such as from an oil rig in the sea. Since late last year the platform\u00a0&#8220;Edvard Grieg&#8221; in operation\u00a0at the west coast of Norway.\u00a0In this platform\u00a0are working machines of\u00a0company Strobl pumps from Hilpoltstein. &#8220;While we do not pump the oil out of the earth, but our machines ensure the cooling cycle, the water supply and the lubricant distribution on the platform,&#8221; says the managing director Robert Strobl. The 56-year-old industrial designer\u00a0worked years in the distribution of a pump manufacturer, until it went into bankruptcy. Out of necessity, he founded his company in 2006 together with his son Christopher, who was still a student then and now cares as an operation manager <\/span><span lang=\"en\">to purchase, production and planning.<\/span><\/p>\n<p>Robert Strobl has started in a 14-square-meter basement office in his onw house. Together with a designer, he designed\u00a0three dimensional models on the computer and sent the data to a CNC-Machining\u00a0processing company in Georgensgm\u00fcnd. After machining the items were then assembled in Hilpoltstein.<\/p>\n<p><span lang=\"en\">In\u00a02010 an office building\u00a0with assembly hall and warehouse was built at\u00a0the industrial area &#8220;Am Kr\u00e4nzleinsberg&#8221; in Hilpoltstein. Seven employees work there to take care of planning, sales and installation. An employee is working in Northern Germany\u00a0sales area. To date, have to help in the assembly now holiday workers. &#8220;Our goal is to continue to adjust another employee,&#8221; says Strobl. The business is currently being pretty good, even in the holiday season, the work is inevitable: &#8220;We are not dependent on the seasons, someone always needs pumping systems&#8221;.<\/span><\/p>\n<p><span lang=\"en\">&#8220;A mainstay of the company are pumps for waste water and environmental systems. But also for the oil-, gas- and food industry, there are pumps from\u00a0development by Strobl Pumpen in Hilpoltstein . Build can do almost anything. &#8220;Only physical limits we can not be lifted. Unfortunately, even if a\u00a0few customers would sometimes wish that,&#8221; says the 32-year-old Christoph Strobl.<\/span><\/p>\n<p><span lang=\"en\"> &#8220;The cheapest pump in the market we don\u00b4t\u00a0offer&#8221;, says managing director Robert Strobl.\u00a0That is\u00a0not the company&#8217;s philosophy: &#8220;Price war is nothing what\u00a0we want, quality is important, so we can only manufacture in Germany.&#8221;<\/span><\/p>\n<p><span lang=\"en\">Then customizations are performed to\u00a0special requests, such as another power, other drives or foreign standards that can take depending on the effort of a few days up to several weeks. Completely new planned pumps need from order to completion about 12 to 30 weeks.<\/span><\/p>\n<p><span lang=\"en\"> In the Norwegian oil rig, the first pump could to go in operation in about 22 weeks. About 20 units from Hilpoltstein make the job there, the smallest weighs about \u00a0400 kg, the largest 3.5 tons. Often, an engineer comes up to the eight-man company, bringing an order and technical advice to us. &#8220;For Norway, we had to work through 1500 pages,&#8221; says Robert Strobl.<\/span><\/p>\n<p><span lang=\"en\">We only informed\u00a0the process engineers\u00a0with approximate pump dimensions. After the final\u00a0workings of the platform was finished on the paper,\u00a0it was not allowed to be different in dimension, &#8220;says Strobl.<\/span><\/p>\n<p><strong><span lang=\"en\"> Difficult conditions<\/span><\/strong><\/p>\n<p><span lang=\"en\"> &#8220;The first four years of independence were difficult, the support from the state was far away from good,&#8221; said Strobl recalls. Although there were a founding grant and a loan from the KfW. The conditions were\u00a0difficult and the tax\u00a0in the beginning was rather high.<\/span><\/p>\n<p><span lang=\"en\">Only\u00a0the land search was not a problem.\u00a0This year we built a new\u00a0450 square meters\u00a0warehouse and assembly hall.<\/span><\/p>\n<p><span lang=\"en\"> Actual\u00a0Strobl Pumpen develops\u00a0at the moment\u00a0a new pump with explosion-proof electric motor of its own design. An authority just checked the product, the company hopes to bring it at the end the year in\u00a0the market.<\/span><\/p>\n<p><span lang=\"en\"> In addition to the Norwegian oil platform\u00a0in a Swedish steel mill operate Strobl special high pressure pumps for acid. Even after India, China and Ecuador, the company has already delivered. But it must not be so far away: In the Hilpoltsteiner waste water treatment plan\u00a0operate\u00a0three of our sewage pumps for sewage water transport and circulation .<\/span><\/p>\n<p><em><span lang=\"en\"> Source: Roth-Hilpoltsteiner Volkszeitung, 09.08.2016<\/span><\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>More than a century was oil, the lubricant of &#8230;<\/p>\n","protected":false},"author":3,"featured_media":516,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-neuigkeiten"],"_links":{"self":[{"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/posts\/498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/comments?post=498"}],"version-history":[{"count":16,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/posts\/498\/revisions"}],"predecessor-version":[{"id":517,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/posts\/498\/revisions\/517"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/media\/516"}],"wp:attachment":[{"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/media?parent=498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/categories?post=498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.strobl-pumpen.de\/en\/wp-json\/wp\/v2\/tags?post=498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}