March 03 2020

High pressure pumps for Mumbadala Petroleum

Another project that we could win, are two high pressure pumps series CPP for Mumbadala Petroleum.
These pumps will be used in the Pegaga gasfield that is located in front of Borneo’s cost. Our high pressure pumps, that are designed for a pressure of up to 150 bar, will be installed in the measurement circulation, in which the composition of the gas is checked. This project is effected by us together with Teraju Petroleum by proxy of Mumbadala Petroleum, Petronas and the operating company Krohne. Delivery is planned to be within the first quarter of 2020.